Monterey Street Watermain Replacement

Job Name:               Monterey Street Watermain Replacement

Client:                     City of San Luis Obispo

Project Value:           $450,000

Completion Date:     January 2017

Description of work:  Project consists of installing a new waterline and abandoning the existing the existing, including new fire hydrants and services.

1504+SLO+Waterline+01.jpg
1504 SLO Waterline 02.jpg
1504 SLO Waterline 04.JPG

Salinity Management Pipeline

Job Name:                       Salinity Management Pipeline, Phase 1e

Client:                             Calleguas Municipal Water District

Project Value: $23.8 million

Completion Date:             July 2012

Description of work:       The project includes installation of 10,784’ of 48” welded steel pipe, 894’ of 12” welded steel pipe, installation of 766’ of 62” diameter and 84’ of 30” diameter steel casing by trenchless installation methods, 97’ of 62” diameter steel casing by open cut, a flow control station, a meter station, and by-pass piping

0905 Calleguas 01.jpg
0905 Calleguas.JPG

San Ricardo Well Pump & Tank Installation Project

Job Name:                San Ricardo Well Pump & Tank Installation Project

Client:                      Goleta Water District

Project Value: $880,000

Completion Date:      June 2013

Description of work:  The work includes restoration of the San Ricardo well, installation of new tanks, and improving on the existing treatment system by installation of new equipment and all necessary appurtenances.

1205 Goleta 02.JPG
1205 Goleta 06.JPG

Unit II Channel Improvements Project

Job Name:                Unit II Channel Improvements Project

Client:                       Santa Barbara County Flood Control District

Project Value: $1,900,000

Completion Date:      March 2019

Description of work:  Project consists of regrading and realigning 6,473’ of earthen channel, removal and replacement of concrete inlet / headwall structure, and replacement of slope protection

1714 Channel Improvements 03.jpg
1714 Channel Improvements 06.JPG
1714 Channel Improvements 08.JPG

Hollister Ranch

Job Name:               Hollister Ranch

Client:                     Alegria Mutual Water Company

Project Value: $400,000

Completion Date:   October 2018

Description of work:    Project consists of regrading and expanding existing reservoir, underground piping, surface drainage features, reservoir liner, and all-weather roadway.

1813 Hollister Ranch 01.JPG